LogoLogo
HomeWhat We DoProjectsCoastal Walkway Struct...

Who We Are

Our StoryOur ValuesOur Team

What We Do

MiningConstructionMarineEnergyView our ProjectsView our CapabilitiesView our Products

Sustainable Excellence

Health and SafetyQualityEnvironmentalSustainability

Working Together

Why Choose KAWCommunity SupportIndigenous EngagementCareers

Contact Us

Email UsCall UsLocations
KAW Engineering
Site MapCookiesPrivacyDisclaimer
© 2026 KAW Engineering Pty Ltd. All rights reserved.

Coastal Walkway Structural Steel Installation

Industry

Construction

Construction

/

Location

Karratha Coastline, WAKarratha Coastline, WA

Karratha Coastline, WAKarratha Coastline, WA

/

Year

2018

2018

/

Client

City of Karratha

City of Karratha

Share

Coastal Walkway Structural Steel Installation

The Challenge

The project involved fabricating and installing structural steel supports for a coastal walkway exposed to salt, wind, and constant moisture. The client required a solution that could withstand long-term corrosion and high pedestrian loads while maintaining an architectural finish suitable for a public environment.

Our Approach

Our fabrication team engineered each component using marine-grade materials and precision welding techniques to ensure maximum structural integrity and corrosion resistance. All steelwork was treated with a multi-layer protective coating system and inspected prior to installation. The installation was completed efficiently within a narrow coastal corridor, adhering to strict environmental and safety protocols.

The Impact

The completed walkway structure now provides a safe, long-lasting, and visually appealing public pathway capable of withstanding the demands of a harsh marine climate. Through attention to detail and robust fabrication practices, KAW delivered a solution that enhances the coastal landscape while minimising long-term maintenance costs.

Project Capabilities

View All
Coded Welding

Coded Welding

Specialised welding services across pipelines, structural steel and exotic materials, fully compliant with international codes and standards.

Related projects

ROV Support Vessel Mobilisation Hotworks Support

ROV Support Vessel Mobilisation Hotworks Support

Marine|2025|Dampier
MV Olympius – Hull Damage Repair

MV Olympius – Hull Damage Repair

Marine|2020|Dampier Outer Anchorage
ROV Support Vessel Mobilisation Hotworks Support

ROV Support Vessel Mobilisation Hotworks Support

Marine|2025|Dampier
KAW car on a mine site.

Let's tackle the tough challenges together

Contact UsExplore Careers

or

(08) 9144 2465Email Us